{"anchor":"crossref:10.1016/j.ijhydene.2019.01.201","by_predicate":{"cites":[{"cited":"crossref:10.1016/j.ijhydene.2017.02.147","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2016.10.070","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.applthermaleng.2016.12.016","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2017.06.116","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijepes.2017.11.037","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.apenergy.2017.08.197","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.epsr.2017.07.014","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2012.02.023","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.conengprac.2016.02.002","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.epsr.2017.02.012","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tpwrs.2008.922654","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2014.04.059","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.epsr.2012.08.005","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijepes.2014.06.027","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ins.2016.01.081","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2012.11.035","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2015.02.108","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tsg.2016.2598678","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.rser.2015.01.062","direction":"outgoing","title":null},{"cited":"crossref:10.1049/iet-gtd.2015.0473","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2014.02.043","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2018.06.171","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2018.09.085","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.epsr.2010.08.009","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.jpowsour.2011.05.081","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.renene.2015.07.021","direction":"outgoing","title":null},{"citing":"crossref:10.1016/j.scs.2019.101921","direction":"incoming","title":"RETRACTED: Modeling and prioritizing dynamic demand response programs in the electricity markets"},{"citing":"crossref:10.1016/j.ijhydene.2019.07.226","direction":"incoming","title":"RETRACTED: Optimal scheduling of intelligent parking lot using interval optimization method in the presence of the electrolyser and fuel cell as hydrogen storage system"},{"citing":"crossref:10.1016/j.ijhydene.2019.11.030","direction":"incoming","title":"RETRACTED: Risk-involved stochastic performance of hydrogen storage based intelligent parking lots of electric vehicles using downside risk constraints method"},{"citing":"crossref:10.1016/j.ijhydene.2020.08.227","direction":"incoming","title":"RETRACTED: Risk-constrained scheduling of a CHP-based microgrid including hydrogen energy storage using robust optimization approach"}]},"contesting_ideas":[],"elapsed_us":13035,"energy_joules":0.23463,"supporting_ideas":[],"total_edges":30,"work":"crossref:10.1016/j.ijhydene.2019.01.201"}