{"anchor":"crossref:10.1016/j.ijhydene.2019.11.030","by_predicate":{"cites":[{"cited":"crossref:10.1016/j.enconman.2017.02.030","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2019.07.226","direction":"outgoing","title":"RETRACTED: Optimal scheduling of intelligent parking lot using interval optimization method in the presence of the electrolyser and fuel cell as hydrogen storage system"},{"cited":"crossref:10.1016/j.ijhydene.2017.01.208","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2018.12.054","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2018.08.098","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.jclepro.2019.05.142","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.jclepro.2018.09.222","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tste.2013.2264498","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tvt.2015.2487515","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tsg.2015.2505298","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tsg.2015.2403287","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tsg.2015.2496796","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tii.2015.2482919","direction":"outgoing","title":null},{"cited":"crossref:10.1109/jsyst.2014.2349357","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tste.2013.2274601","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tsg.2015.2404892","direction":"outgoing","title":null},{"cited":"crossref:10.1109/tpwrs.2014.2359919","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.renene.2015.09.054","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.tra.2015.09.011","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.enconman.2014.06.044","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.energy.2013.11.045","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.jfranklin.2014.01.019","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.enconman.2013.09.006","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijepes.2012.10.041","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijepes.2014.12.026","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2017.02.147","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2019.01.201","direction":"outgoing","title":"RETRACTED: Optimal economic-emission performance of fuel cell/CHP/storage based microgrid"},{"cited":"crossref:10.1016/j.ijhydene.2019.09.222","direction":"outgoing","title":"RETRACTED: Risk-averse stochastic operation of a power system integrated with hydrogen storage system and wind generation in the presence of demand response program"},{"cited":"crossref:10.1016/j.ijhydene.2019.03.158","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2019.02.169","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2019.04.054","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.apenergy.2016.11.024","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.ijhydene.2016.10.070","direction":"outgoing","title":null},{"cited":"crossref:10.1016/j.applthermaleng.2019.113825","direction":"outgoing","title":"RETRACTED: Risk-based stochastic scheduling of energy hub system in the presence of heating network and thermal energy management"},{"citing":"crossref:10.1016/j.ijhydene.2020.08.227","direction":"incoming","title":"RETRACTED: Risk-constrained scheduling of a CHP-based microgrid including hydrogen energy storage using robust optimization approach"}]},"contesting_ideas":[],"elapsed_us":968,"energy_joules":0.017424,"supporting_ideas":[],"total_edges":35,"work":"crossref:10.1016/j.ijhydene.2019.11.030"}