{"anchor":"crossref:10.1109/iccms.2009.24","by_predicate":{"cites":[{"cited":"crossref:10.1109/wsc.2001.977398","direction":"outgoing","title":null},{"citing":"crossref:10.1109/iccet.2010.5485701","direction":"incoming","title":"Notice of Retraction: The algorithm of confirming increasable bottleneck device in dynamic integrated scheduling based on static parallel time"}]},"contesting_ideas":[],"elapsed_us":2385,"energy_joules":0.042929999999999996,"supporting_ideas":[],"total_edges":2,"work":"crossref:10.1109/iccms.2009.24"}