{"anchor":"crossref:10.5772/58442","by_predicate":{"cites":[{"citing":"crossref:10.5772/61239","direction":"incoming","title":"Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project"}]},"contesting_ideas":[],"elapsed_us":267,"energy_joules":0.0048059999999999995,"supporting_ideas":[],"total_edges":1,"work":"crossref:10.5772/58442"}