{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1016%2Fj.apm.2018.11.015","author_ids":["orcid:0000-0002-4134-9263","oa-author:A5072863074","oa-author:","orcid:0000-0002-1685-3257"],"author_names":["Mohammad Sheikhalishahi","N. Eskandari","A. Mashayekhi","Ali Azadeh"],"authors":[{"id":"orcid:0000-0002-4134-9263","name":"Mohammad Sheikhalishahi","orcid":"0000-0002-4134-9263"},{"id":"oa-author:A5072863074","name":"N. Eskandari"},{"id":"oa-author:","name":"Wenhao Liao"},{"id":"orcid:0000-0002-1685-3257","name":"Ali Azadeh","orcid":"0000-0002-1685-3257"}],"cited_by_count":0,"concept_ids":[],"doi":"10.1016/j.apm.2018.11.015","id":"crossref:10.1016/j.apm.2018.11.015","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1016%2Fj.apm.2018.11.015","media_ids":[],"openalex_id":"W2901460396","references_count":47,"retracted":true,"retraction":{"date":"2019-03-01","kind":"retraction","reasons":["RETRACTED: Multi-objective open shop scheduling by considering human error and preventive maintenance"],"source":"crossref"},"source":"crossref","title":"RETRACTED: Multi-objective open shop scheduling by considering human error and preventive maintenance","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1016%2Fj.apm.2018.11.015","year":2019}