{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1109%2Fappeec.2010.5448168","author_ids":["oa-author:A5103621708","orcid:0000-0003-2356-9737","oa-author:A5100914988"],"author_names":["Ju Ge","Lizi Zhang","Yan Geng"],"authors":[{"id":"oa-author:A5103621708","name":"Ju Ge"},{"id":"orcid:0000-0003-2356-9737","name":"Lizi Zhang","orcid":"0000-0003-2356-9737"},{"id":"oa-author:A5100914988","name":"Yan Geng"}],"cited_by_count":0,"concept_ids":[],"doi":"10.1109/appeec.2010.5448168","id":"crossref:10.1109/appeec.2010.5448168","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1109%2Fappeec.2010.5448168","media_ids":[],"openalex_id":"W2292946974","references_count":0,"retracted":true,"retraction":{"date":"2010-04-15","kind":"retraction","reasons":["Notice of Retraction: Study on Optimization Model of AGC Dispatch Schedule in the Energy Saving Dispatch"],"source":"crossref"},"source":"crossref","title":"Notice of Retraction: Study on Optimization Model of AGC Dispatch Schedule in the Energy Saving Dispatch","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1109%2Fappeec.2010.5448168","year":2010}