{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1109%2Ficacc.2010.5486938","author_ids":["orcid:0000-0003-3854-0718","oa-author:A5062806116","oa-author:"],"author_names":["Ning Guo","Tian-guo Jing","Wen-jian Liu"],"authors":[{"id":"orcid:0000-0003-3854-0718","name":"Ning Guo","orcid":"0000-0003-3854-0718"},{"id":"oa-author:A5062806116","name":"Tian-guo Jing"},{"id":"oa-author:","name":"Wenhao Liao"}],"cited_by_count":0,"concept_ids":[],"doi":"10.1109/icacc.2010.5486938","id":"crossref:10.1109/icacc.2010.5486938","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1109%2Ficacc.2010.5486938","media_ids":[],"openalex_id":"W2276675714","references_count":8,"retracted":true,"retraction":{"date":"2010-06-17","kind":"retraction","reasons":["Notice of Retraction: A new manufacturing scheduling system model and its implementation"],"source":"crossref"},"source":"crossref","title":"Notice of Retraction: A new manufacturing scheduling system model and its implementation","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1109%2Ficacc.2010.5486938","year":2010}