{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1109%2Ficebeg.2011.5877026","author_ids":["oa-author:A5078917460","oa-author:","orcid:0000-0003-1873-0194"],"author_names":["Qingchao Yang","Wang Tienan","Zhe Hao"],"authors":[{"id":"oa-author:A5078917460","name":"Qingchao Yang"},{"id":"oa-author:","name":"Wenhao Liao"},{"id":"orcid:0000-0003-1873-0194","name":"Zhe Hao","orcid":"0000-0003-1873-0194"}],"cited_by_count":0,"concept_ids":[],"doi":"10.1109/icebeg.2011.5877026","id":"crossref:10.1109/icebeg.2011.5877026","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1109%2Ficebeg.2011.5877026","media_ids":[],"openalex_id":"W1519139489","references_count":0,"retracted":true,"retraction":{"date":"2011-06-16","kind":"retraction","reasons":["Notice of Retraction: Management and control of geotechnical engineering construction project"],"source":"crossref"},"source":"crossref","title":"Notice of Retraction: Management and control of geotechnical engineering construction project","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1109%2Ficebeg.2011.5877026","year":2011}