{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1145%2F3465631.3465673","author_ids":["oa-author:","orcid:0000-0001-7857-1266","orcid:0000-0002-9959-5029"],"author_names":["Lirong Bao","Yong Zhang","Chunxiao Li"],"authors":[{"id":"oa-author:","name":"Wenhao Liao"},{"id":"orcid:0000-0001-7857-1266","name":"Yong Zhang","orcid":"0000-0001-7857-1266"},{"id":"orcid:0000-0002-9959-5029","name":"Chunxiao Li","orcid":"0000-0002-9959-5029"}],"cited_by_count":0,"concept_ids":[],"doi":"10.1145/3465631.3465673","id":"crossref:10.1145/3465631.3465673","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1145%2F3465631.3465673","media_ids":[],"openalex_id":"W3196061008","references_count":0,"retracted":true,"retraction":{"date":"2022-02-24","kind":"retraction","reasons":["<i>Retracted on February 24, 2022</i>\n                    : Equity Structure Allocation of Urban Rail Traffic PPP Project"],"source":"crossref"},"source":"crossref","title":"<i>Retracted on February 24, 2022</i>\n                    : Equity Structure Allocation of Urban Rail Traffic PPP Project","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1145%2F3465631.3465673","year":2021}