{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.1155%2F2020%2F4350708","author_ids":[],"author_names":[],"authors":[],"cited_by_count":0,"concept_ids":[],"doi":"10.1155/2020/4350708","id":"crossref:10.1155/2020/4350708","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.1155%2F2020%2F4350708","media_ids":[],"references_count":1,"retracted":true,"retraction":{"date":"2020-09-30","kind":"retraction","reasons":["Retracted: Operational Risk Assessment for International Transport Corridor: A Case Study of China-Pakistan Economic Corridor"],"source":"crossref"},"source":"crossref","title":"Retracted: Operational Risk Assessment for International Transport Corridor: A Case Study of China-Pakistan Economic Corridor","url":"https://scholar.askdavidc.ai/work/crossref%3A10.1155%2F2020%2F4350708","year":2020}