{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.5772%2F58442","author_ids":["crossref-author:bf4fe0b1e8951752","crossref-author:26ffc6e503da5ed8","crossref-author:590f2606c012462e","crossref-author:e53bb5975bccc14a"],"author_names":["Wenping Liu","Hongling Guo","Heng Li","Yan Li"],"authors":[{"id":"crossref-author:bf4fe0b1e8951752","name":"Wenping Liu"},{"id":"crossref-author:26ffc6e503da5ed8","name":"Hongling Guo"},{"id":"crossref-author:590f2606c012462e","name":"Heng Li"},{"id":"crossref-author:e53bb5975bccc14a","name":"Yan Li"}],"cited_by_count":1,"concept_ids":[],"doi":"10.5772/58442","id":"crossref:10.5772/58442","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.5772%2F58442","media_ids":[],"references_count":0,"retracted":true,"retraction":{"date":"2014-01-01","kind":"retraction","reasons":["Retracted: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project"],"source":"crossref"},"source":"crossref","title":"Retracted: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project","url":"https://scholar.askdavidc.ai/work/crossref%3A10.5772%2F58442","year":2014}