{"aliases":[],"argument_graph":"https://scholar.askdavidc.ai/api/argument-graph.json?work=crossref%3A10.5772%2F61239","author_ids":["crossref-author:5fc2588083e225fe","crossref-author:95f6fdead580437d","crossref-author:cb35ae0623edb080","crossref-author:f24664a8ca5272f1"],"author_names":["Wenping Liu","Hongling Guo","Heng Li","Yan Li"],"authors":[{"id":"crossref-author:5fc2588083e225fe","name":"Wenping Liu"},{"id":"crossref-author:95f6fdead580437d","name":"Hongling Guo"},{"id":"crossref-author:cb35ae0623edb080","name":"Heng Li"},{"id":"crossref-author:f24664a8ca5272f1","name":"Yan Li"}],"cited_by_count":0,"concept_ids":[],"doi":"10.5772/61239","id":"crossref:10.5772/61239","iiif_manifest":"https://scholar.askdavidc.ai/iiif/manifest/crossref%3A10.5772%2F61239","media_ids":[],"references_count":1,"retracted":true,"retraction":{"date":"2015-07-14","kind":"retraction","reasons":["Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project"],"source":"crossref"},"source":"crossref","title":"Retraction Notice: Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-Span Steel-Box Arch Bridge Project","url":"https://scholar.askdavidc.ai/work/crossref%3A10.5772%2F61239","year":2015}