construction sequence

2 moment(s) that assert this concept — showing 1–2 of 2

moderateTwo independent sources — corroborated, but not broadly
↣ how this spread over time →
provenance — click a node to open its encoding unit
[1] Building[2] WHSAD
showing 2 of 2 moments
Building Integrity · youtube · en-US
1The upper ceiling of the vault is poured last and includes manhole covers for access to perform maintenance and work inside the vault.
“the upper part of the Vault uh this ceiling if you will it gets poured last and then there's going to be some manhole covers so that you can get into this area to work on this thing”
spoken · 457s · 2023-04-05
WHSAD TV - News and Videos · youtube · en
2Architectural finishes begin after the structural framework is established, with initial construction phases involving reinforcement, concrete placement, and temporary railings that are later replaced with permanent ones.
“what it started out is in a big hole with with reinforcement then concrete was placed and then stairs were placed with temporary railings which will then be replaced by much nicer railings and here is when the architecture finishes start to come in”
spoken · 744s · 2016-03-25