1[OpenIE Chronicle Era I Founding Essay · Every Query Has a Cost in Joules (Original Date: 2026-02-13, Refreshed: 2026-11-25, Signed Provenance · Self-Checked, Energy Class: reported_j, measured_j ⊥ reported_j ⊥ est_j ⊥ unmetered)] Historical Feb 2026 Thesis (preserved verbatim above dated errata at https://blog.openie.dev/posts/every-query-has-a-cost-in-joules/): Exposing per-query energy telemetry alongside multi-representation storage makes query routing energy-visible, though February 2026 mixed IOKit/RAPL counters (reportedj) with TDP fallbacks (estj) and compared Arrow columnar SUM against an unindexed sequential row scan rather than DuckDB or ClickHouse. Scope & headline metric: Founding Essay (mixed reportedj / estj — corrected in Errata) → 4-Class Non-Mixing Lattice & 1.77 µJ Lookup (reportedj). Evolved into November 2026 studies: Satiation Benchmark Harness (https://research.openie.dev/papers/satb-harness/); Time as an Index (https://research.openie.dev/papers/time-as-an-index/); Sub-Microsecond State & Verifiable Logs (https://research.openie.dev/tv/?study=eco-database).
“Every Query Has a Cost in Joules (https://blog.openie.dev/posts/every-query-has-a-cost-in-joules/) — There's a question I've been asking database engineers for years, and nobody has ever had a good answer. They can tell me the p99 latency. They can tell me the rows scanned, the index utilization, the cache hit ratio. They can show me traces, flamegraphs, execution plans that span three monitors. But joules? Watts? Actual, physical ener…”
2[OpenIE Chronicle Nov 25, 2026 Errata & Citation Audit · Every Query Has a Cost in Joules (https://blog.openie.dev/posts/every-query-has-a-cost-in-joules/, Era I Founding Essay, Signed Provenance · Self-Checked, Energy Class: reported_j)] November 25, 2026 outside-review corrections & citation audit: The February 13, 2026 essay above is restored verbatim from founding commit 5e5f2a3 (reversing silent mid-year edits to the telemetry section so the original February claims remain fully auditable), with four explicit technical and licensing corrections: 1. The 30–50% Citation (): The body cited 30–50% right after stating "The energy cost of this fragmentation is substantial and invisible." To be precise, 30–50% in enterprise infrastructure reports refers either to financial total-cost-of-ownership (TCO) share (licensing, engineering staffing, ETL maintenance, and duplicated clusters—note also that pointed to a generic McKinsey Digital landing URL rather than a public peer-reviewed dataset) or, in data-center energy literature, to non-IT facility co…
“November 25, 2026 Errata (https://blog.openie.dev/posts/every-query-has-a-cost-in-joules/#how-our-thinking-evolved-by-november-2026): The February 13, 2026 essay above is restored verbatim from founding commit 5e5f2a3 (reversing silent mid-year edits to the telemetry section so the original February claims remain fully auditable), with four explicit technical and licensing corrections: 1. The 30–50% Citation (): The body cited 30–50% r…”