leaseholders

4 moment(s) that assert this concept — showing 1–4 of 4

strong3 independent sources
↣ how this spread over time →
provenance — click a node to open its encoding unit
[1] Jim[2] Florence[3] Florence[4] Jim
showing 4 of 4 moments
Jim Dickson · ukparliament · en
1Disputes between managing agents and developers over fire safety reports at Heron Court have led to ongoing negotiations on access for inspections, with leaseholders facing costs without a mechanism to resolve the conflict.
“There is a dispute between FirstPort, the managing agents, and Taylor Wimpey, the developer, about the fire safety report that has been undertaken, with one party not happy with it. Negotiations on access for a further inspection have been ongoing since the start of the year to try to clarify what work needs to be undertaken, which has left the building’s leaseholders facing a bill for the 24-hour waking watch, while having no levers to bring the other parties together to move the issue forward.”
spoken · 0s · 2026-09-15
Florence Eshalomi · ukparliament · en
2Public funding is available for life-threatening cladding risks in residential buildings over 11 metres high, protecting leaseholders from remediation costs.
“public funding is available to address life-threatening cladding risk on residential buildings over 11 metres high, so that no leaseholder in those buildings will face cladding remediation costs”
spoken · 0s · 2026-09-15
Florence Eshalomi · ukparliament · en
3Leaseholders are protected from non-cladding and interim remediation costs, with cost caps based on property value and location.
“Many holders of qualifying leases are protected in full from non-cladding and interim measures—for example, where the landlord or its group meets the contribution condition or where the property value is below the set threshold. Other qualifying leaseholders have their costs firmly capped and spread over 10 years”
spoken · 0s · 2026-09-15
Jim Shannon · ukparliament · en
4Some leaseholders in London have lost up to £100,000 in property value due to a five-year delay in cladding remediation works.
“reports of some leaseholders in London losing around £100,000 on the value of their flat as a result of a five-year delay in remediation plans and works”
spoken · 0s · 2026-09-15