notational-intelligence

also known as Notational Intelligence

11 moment(s) that assert this concept — showing 1–11 of 11

strong3 independent sources
↣ how this spread over time →

reuse terms across this evidence: 10 openly licensed · 1 undeclared

provenance — click a node to open its encoding unit
[1] David[2] David[3] David[4] David[5] David[6] David[7] David[8] David[9] David[10] David[11] OpenIE
showing 11 of 11 moments
scholarly papers (2)
David Charlot (OpenIE) · openie_research · en
1[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] A gate that lets a machine act only after a check passes, and a cascade that tries the cheapest method first, with software results and one board-level energy reading (11,428 pJ per gate cycle, whole module, KV260). Plain words: do not take an action that cannot be undone until a check says it is safe; try the cheapest way first; write every decision down with its energy.
“A gate that lets a machine act only after a check passes, and a cascade that tries the cheapest method first, with software results and one board-level energy reading (11,428 pJ per gate cycle, whole module, KV260). Plain words: do not take”
written · p. 1 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
2[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] *Version 1.2, 11 October 2026. Data and code: [research.openie.dev/data/](/data/#gates). LaTeX PDF: [/pdfs/latex/gates.pdf](/pdfs/latex/gates.pdf) ([source](/pdfs/latex/gates.tex)).*
“*Version 1.2, 11 October 2026. Data and code: [research.openie.dev/data/](/data/#gates). LaTeX PDF: [/pdfs/latex/gates.pdf](/pdfs/latex/gates.pdf) ([source](/pdfs/latex/gates.tex)).*”
written · p. 2 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
3[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] This paper defines a gate that lets a machine act only after a check passes, and a rule that tries the cheapest method first. It reports software results and one board-level energy measurement, each labeled by how it was obtained.
“This paper defines a gate that lets a machine act only after a check passes, and a rule that tries the cheapest method first. It reports software results and one board-level energy measurement, each labeled by how it was obtained.”
written · p. 3 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
4[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] 1. A computer should not take an action that cannot be undone until a simple check says it is safe. 2. It should try the cheapest way to finish a job first and use a big AI model only if nothing cheaper works. 3. Every decision is written down with the energy it used, so anyone can check it later.
“1. A computer should not take an action that cannot be undone until a simple check says it is safe. 2. It should try the cheapest way to finish a job first and use a big AI model only if nothing cheaper works. 3. Every decision is written d”
written · p. 4 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
5[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] This paper has two parts that share one rule: correctness is the gate, and joules are the ranking. Part I is the commit gate. A proposal may not authorize itself. An irreversible act runs only behind a certificate, and every decision, commit or refuse, is written to a receipt. Part II is Mixture of Limits: a task needs a minimal expected energy to close, and energy spent after the task is complete buys n
“This paper has two parts that share one rule: correctness is the gate, and joules are the ranking. Part I is the commit gate. A proposal may not authorize itself. An irreversible act runs only behind a certificate, and every decision, commi”
written · p. 5 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
6[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] One board measurement anchors the gate fabric. On an AMD Kria KV260, the onboard INA260 read SOM-level A/B/A differences of 11,428 pJ per gate cycle (standard error 129 pJ, N = 4) for the WCA gate fabric, and 98.0 pJ per seed cycle (standard error 30.8 pJ, N = 4) for the seed fabric. The INA260 sits on `VCC_SOM`, which feeds the processing system, the programmable logic, DDR memory and the module regulat
“One board measurement anchors the gate fabric. On an AMD Kria KV260, the onboard INA260 read SOM-level A/B/A differences of 11,428 pJ per gate cycle (standard error 129 pJ, N = 4) for the WCA gate fabric, and 98.0 pJ per seed cycle (standar”
written · p. 6 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
7[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] 1. A commit envelope: proposal, then certificate, then commit or refuse, then receipt. The certificate is conjunctive: look-up allow AND an energy predicate, optionally AND a control barrier function. Refusal reasons are typed. A Rust software reference implementation, Wise Computer Automation (WCA), runs it (Part I). 2. A typed provenance invariant. Output labeled `ModelGenerated` can never be promoted
“1. A commit envelope: proposal, then certificate, then commit or refuse, then receipt. The certificate is conjunctive: look-up allow AND an energy predicate, optionally AND a control barrier function. Refusal reasons are typed. A Rust softw”
written · p. 7 · 2026-10-15 · open
David Charlot (OpenIE) · openie_research · en
8[Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems] Let $C(z)$ be the task completion predicate, with any deadline written into it. For a system $S$ with policies $\pi$ and an allowed failure rate $\delta$,
“Let $C(z)$ be the task completion predicate, with any deadline written into it. For a system $S$ with policies $\pi$ and an allowed failure rate $\delta$,”
written · p. 8 · 2026-10-15 · open
David Charlot · openie_research · en
9In 'Metered Commit Gates: Energy-to-Correct-Completion for Agentic Systems' (https://research.openie.dev/papers/gates/), A gate that lets a machine act only after a check passes, and a cascade that tries the cheapest method first, with software results and one board-level energy reading (11,428 pJ per gate cycle, whole module, KV260).
“A gate that lets a machine act only after a check passes, and a cascade that tries the cheapest method first, with software results and one board-level energy reading (11,428 pJ per gate cycle, whole module, KV260).”
written · p. 1 · 2026-11-24 · open
David Charlot · openie_research · en
10Metered Commit Gates plain-language synthesis (https://research.openie.dev/papers/gates/): Plain words: do not take an action that cannot be undone until a check says it is safe; try the cheapest way first; write every decision down with its energy.
“Plain words: do not take an action that cannot be undone until a check says it is safe; try the cheapest way first; write every decision down with its energy.”
written · p. 2 · 2026-11-24 · open
OpenIE Verified Substrate · openie_wai1 · en
11A gate that lets a machine act only after a check passes, and a cascade that tries the cheapest method first, with software results and one board-level energy reading (11,428 pJ per gate cycle, whole module, KV260). Plain words: do not take an action that cannot be undone until a check says it is safe; try the cheapest way first; write every decision down with its energy.
“A computer should not take an irreversible action until an independent check confirms it is safe. It should try the cheapest method first and wake. A large artificial intelligence model only when simpler tools miss. Ever”
written · p. 1 · 2026-11-24