pile refusal

1 moment(s) that assert this concept — showing 1–1 of 1

single sourceRests on a single channel — treat as a lead, verify independently
↣ how this spread over time →
provenance — click a node to open its encoding unit
[1] Practical
showing 1 of 1 moments
Practical Engineering · youtube · en-US
1A pile reaches refusal when successive hammer blows result in minimal penetration, indicating it has encountered sufficient resistance to vertical loads.
“Do this enough times, and eventually, you reach a point where the pile kind of stops moving with each successive hammer blow. In technical terms, the pile has reached refusal.”
spoken · 330s · 2024-07-02