save

1 moment(s) that assert this concept — showing 1–1 of 1

single sourceRests on a single channel — treat as a lead, verify independently
↣ how this spread over time →

reuse terms across this evidence: 1 openly licensed

provenance — click a node to open its encoding unit
[1] OpenIE
showing 1 of 1 moments
scholarly papers (1)
OpenIE Accessibility & Research Desk · openie_glossary · en
1[W3C SKOS + Schema.org AAC Concept · cheapest-first cascade (art:concept:cheapest-first-cascade:6a9864c9c2c6f416, WCAG 2.2 AA, Routing & Cascades)] Plain Definition (14 words <= 16): "Trying quick low-power tools first and waking giant models only when simple tools miss." Easy Read Sentences: Start every job with the smallest, fastest tool. If the small tool passes the check, stop right there. Wake up a giant model only for brand-new hard problems. AAC Core Words (🪜, ARASAAC 'steps'): first, easy, save. Cited OpenIE studies: Metered Commit Gates (/papers/gates/), Downward LUT6 Compilation (/papers/lut-adapt/), RCE-JEPA (/papers/rce-jepa/).
“cheapest-first cascade — Plain Definition (14 words): Trying quick low-power tools first and waking giant models only when simple tools miss. | Source Definition: An order of mechanisms (gears) tried from lowest to highest expected energy, stopping at the first that passes the check. Expected energy is minimized by trying gears in decreasing order of p_i / c_i, with p_i the pa…”
written · p. 9 · 2026-11-24 · open