Encoding unit — one grounded idea

1 Construction of the Sadd el-Kafara dam required quarrying and transporting 100,000 tons of rock and rubble, a massive labor effort for its time.
“Dirt and 100,000 tons of rock and rubble had to be quarried and transported to build this dam, and even more for the one built by Menes.”
spoken · 341s · 2020-08-30 · en-US · HISTORY · Discover the Secrets of Ancient Egypt | Engineering an Empire | Full Episode | H…
id: 3d7cf20693a4e8e4
concepts in this idea