Encoding unit — one grounded idea

1 The distribution of connection queues is uneven across major U.S. energy markets.
“the problem is unevenly distributed. Hmm, and not all of them, I mean, ERCOT is about 100 gigabytes in size, PJM is about 150 gigabytes, that is, peak load.”
spoken · 419s · 2026-09-25 · en-US · Modo Energy · How grid-scale battery storage gets financed and built in the USA | Andy Bowman …
id: 47ff25f92a0dd760
concepts in this idea