1 The bridge was ruled out due to technical complexity, cost overruns, and risks to structural integrity from wind and marine conditions, leading to a shift to a tunnel solution.
“after careful consideration of the risk to the cost overrun and the technical complexities of construction the bridge was firmly ruled out if you can't go over you've got to go under”