Encoding unit — one grounded idea

1 [The Price of the Unexamined Interface] The accounted costs of single interface failures are large and specific: the Mars Surveyor 1998 project, which included Mars Climate Orbiter, cost \$327.6 million [1], and ESA approved 214 million ECU to recover the Cluster mission lost on the first Ariane 5 [4]. The model estimates are larger and broader: NIST put the annual cost of an inadequate software testing infrastructure in the United States at \$59.5 billion [6], and the cost o
“The accounted costs of single interface failures are large and specific: the Mars Surveyor 1998 project, which included Mars Climate Orbiter, cost \$327.6 million [1], and ESA approved 214 million ECU to recover the Cluster mission lost on ”
written · p. 6 · 2026-10-15 · en · David Charlot (OpenIE) · The Price of the Unexamined Interface
id: bb6a3a50b6fe1fc7

from the paper The Price of the Unexamined Interface (2026)

concepts in this idea