Encoding unit — one grounded idea

1 [OpenIE Chronicle Era II Study Dossier · Signed Provenance · Self-Checked · Goal-Holding Agents Under Budget Guards: Pre- and Post-Fix Overspend Audit and Replication Limits (Date: 2026-11-18, Energy Class: reported_j, Track: empirical-engineering, measured_j ⊥ reported_j ⊥ est_j ⊥ unmetered)] Headline: 36/5,400 pre-fix vs. 0/10,800 post-fix overspends · tight-budget gain did not replicate (CPU counter, reportedj). Primary claim: Moving comparison and receipt bookkeeping inside the budget guard cut simulated/counter episode overspends from 36/5,400 (Run 1, firing R-F2) to 0/10,800 (preregistered Run 2, Darwin rienergynj and cycle-modeled Linux, reportedj), while the exploratory tight-budget task gain (+2.65 tasks at B = 1.0) failed to replicate and multiple falsifiers (R-F1..R-F6) fired. Telemetry & baselines: Machine 1: Apple Silicon macOS (procpidrusage rienergynj L3 reportedj). Machine 2: x86-64 Linux (powercap intel-rapl package counter L2 reportedj in Part A; calibrated cycle counter in Part B). Unquiesced hosts (quietwindow = no); no external DC shunt or AC wall meter (measuredj = null). Baselines: Three internal controller arms: adaptive tempo/cascade (sigma-law), fixed heu…
“Goal-Holding Agents Under Budget Guards: Pre- and Post-Fix Overspend Audit and Replication Limits (https://blog.openie.dev/posts/agency/ | https://research.openie.dev/papers/agency/) — [E · reportedj, Darwin rienergynj & Linux RAPL] Before fixing the guard boundary, 36 of 5,400 episodes overspent their declared budget in exploratory Run 1 (firing falsifier R-F2); moving goal comparison and receipt logging inside the guard reduced overs…”
written · p. 1 · 2026-11-18 · en · David Jean Charlot, PhD · OpenIE Chronicle · Goal-Holding Agents Under Budget Guards: Pre- and Post-Fix Ov…
id: c6ee7a28f696b1c2

from the paper Goal-Holding Agents Under Budget Guards: Pre- and Post-Fix Overspend Audit and Replication Limits (OpenIE Chronicle · reported_j) (2026)

concepts in this idea