Retraction Note: Cost optimization in the construction of prefabricated buildings by using BIM and finite element simulation
🔴 Red Signal · Retracted / DefeatedCD₅ Disruption
+0.0000 · FWCI 0.00 · Root Independence 1.00 · Full Standing Citator →Retracted (retraction, 2025-12-22): Retraction Note: Cost optimization in the construction of prefabricated buildings by using BIM and finite element simulation
2025 · doi:10.1007/s00500-025-10995-0 · OpenAlex W7116775153
cite & interoperate (Zotero / Alma / WorldCat ready)
YaFeng Zou, WenHui Feng. (2025). Retraction Note: Cost optimization in the construction of prefabricated buildings by using BIM and finite element simulation. https://doi.org/10.1007/s00500-025-10995-0
@article{crossref101007s005000251,
title = {Retraction Note: Cost optimization in the construction of prefabricated buildings by using BIM and finite element simulation},
author = {YaFeng Zou and WenHui Feng},
year = {2025},
doi = {10.1007/s00500-025-10995-0}
}
JSON · BibTeX · BibLaTeX · RIS (EndNote) · CSL-JSON · MARC21 XML · BIBFRAME 2.0 · citations JSON · CITO argument graph · IIIF v3 manifest · embed card