RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

🔴 Red Signal · Retracted / DefeatedCD₅ Disruption -1.0000 · FWCI 0.05 · Root Independence 1.00 · Full Shepard Citator →
Retracted (retraction, 2021-09-15): RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

Maziar Yazdani ORCID, Kamyar Kabirifar ORCID, Amir M. Fathollahi‐Fard ORCID, Mohammad Mojtahedi ORCID

2021 · doi:10.1007/s11356-021-16285-0 · OpenAlex W3199586433

cited by (1)
references (101)
cite & interoperate (Zotero / Alma / WorldCat ready)

Maziar Yazdani et al. (2021). RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates. https://doi.org/10.1007/s11356-021-16285-0

@article{crossref101007s113560211,
  title = {RETRACTED ARTICLE: Production scheduling of off-site prefabricated construction components considering sequence dependent due dates},
  author = {Maziar Yazdani and Kamyar Kabirifar and Amir M. Fathollahi‐Fard and Mohammad Mojtahedi},
  year = {2021},
  doi = {10.1007/s11356-021-16285-0}
}

JSON · BibTeX · BibLaTeX · RIS (EndNote) · CSL-JSON · MARC21 XML · BIBFRAME 2.0 · citations JSON · CITO argument graph · IIIF v3 manifest · embed card