Notice of Retraction: The algorithm of confirming increasable bottleneck device in dynamic integrated scheduling based on static parallel time
🔴 Red Signal · Retracted / DefeatedCD₅ Disruption
+0.0000 · FWCI 0.00 · Root Independence 1.00 · Full Standing Citator →Retracted (retraction, 2010-06-17): Notice of Retraction: The algorithm of confirming increasable bottleneck device in dynamic integrated scheduling based on static parallel time
Zhiqiang Xie ORCID, Qinglian Yu, Yue Wang ORCID, Jing Yang ORCID
2010 · doi:10.1109/iccet.2010.5485701 · OpenAlex W1544187901
references (4)
- crossref:10.1007/s10845-005-0021-x
- Notice of Retraction: Study on Confirming Increasable Bottleneck Device in Complex Product Dynamic Scheduling retracted Zhiqiang Xie et al. 2009
- crossref:10.1111/j.1937-5956.1994.tb00107.x
- crossref:10.3901/cjme.2008.04.097
cite & interoperate (Zotero / Alma / WorldCat ready)
Zhiqiang Xie et al. (2010). Notice of Retraction: The algorithm of confirming increasable bottleneck device in dynamic integrated scheduling based on static parallel time. https://doi.org/10.1109/iccet.2010.5485701
@article{crossref101109iccet20105,
title = {Notice of Retraction: The algorithm of confirming increasable bottleneck device in dynamic integrated scheduling based on static parallel time},
author = {Zhiqiang Xie and Qinglian Yu and Yue Wang and Jing Yang},
year = {2010},
doi = {10.1109/iccet.2010.5485701}
}
JSON · BibTeX · BibLaTeX · RIS (EndNote) · CSL-JSON · MARC21 XML · BIBFRAME 2.0 · citations JSON · CITO argument graph · IIIF v3 manifest · embed card