Notice of Retraction: Control of enterprise total labor cost based on break-even analysis
Retracted (retraction, 2011-06-16): Notice of Retraction: Control of enterprise total labor cost based on break-even analysis
2011 · doi:10.1109/icebeg.2011.5881482 · OpenAlex W1923221140
cite & interoperate
Xiao Juanjuan. (2011). Notice of Retraction: Control of enterprise total labor cost based on break-even analysis. https://doi.org/10.1109/icebeg.2011.5881482
@article{crossref101109icebeg2011,
title = {Notice of Retraction: Control of enterprise total labor cost based on break-even analysis},
author = {Xiao Juanjuan},
year = {2011},
doi = {10.1109/icebeg.2011.5881482}
}
JSON · citations JSON · CITO argument graph · IIIF v3 manifest · embed card