Notice of Retraction: Research on the optimal incentive contract considering contractor’s intrinsic motivation in the construction quality insurance system
Retracted (retraction, 2008-09-05): Notice of Retraction: Research on the optimal incentive contract considering contractor’s intrinsic motivation in the construction quality insurance system
Wenhao Liao, Lieyun Ding ORCID, Hanbin Luo ORCID, Wenhao Liao
2008 · doi:10.1109/icmlc.2008.4620496 · OpenAlex W2197575304
references (13)
- crossref:10.1006/obhd.1999.2826
- crossref:10.1016/j.jhealeco.2004.01.004
- crossref:10.1016/j.paid.2007.02.017
- crossref:10.1016/j.psychsport.2006.06.007
- crossref:10.1016/j.socscimed.2006.03.008
- crossref:10.1016/s0047-2727(01)00128-1
- crossref:10.1016/s0165-1765(02)00322-1
- crossref:10.1016/s0167-4870(99)00009-4
- crossref:10.1016/s0167-6296(02)00104-2
- crossref:10.1016/s0167-7187(96)01028-4
- crossref:10.1016/s0899-8256(02)00002-7
- crossref:10.1257/aer.90.5.1346
- crossref:10.3386/w5705
cite & interoperate
Wenhao Liao et al. (2008). Notice of Retraction: Research on the optimal incentive contract considering contractor’s intrinsic motivation in the construction quality insurance system. https://doi.org/10.1109/icmlc.2008.4620496
@article{crossref101109icmlc20084,
title = {Notice of Retraction: Research on the optimal incentive contract considering contractor’s intrinsic motivation in the construction quality insurance system},
author = {Wenhao Liao and Lieyun Ding and Hanbin Luo and Wenhao Liao},
year = {2008},
doi = {10.1109/icmlc.2008.4620496}
}
JSON · citations JSON · CITO argument graph · IIIF v3 manifest · embed card