Notice of Retraction Enhancing ABC Optimization with Ai-Net Algorithm for solving project scheduling problem
Retracted (retraction, 2011-09-19): Notice of Retraction Enhancing ABC Optimization with Ai-Net Algorithm for solving project scheduling problem
Renbin Xiao ORCID, Tinggui Chen ORCID
2011 · doi:10.1109/icnc.2011.6022504 · OpenAlex W1828226691
references (9)
- crossref:10.1007/s10898-007-9149-x
- crossref:10.1016/j.asoc.2007.05.007
- crossref:10.1016/j.ejor.2006.06.074
- crossref:10.1016/j.rse.2010.10.005
- crossref:10.1080/07408178508975272
- crossref:10.1109/cec.2002.1007011
- crossref:10.1115/1.1898342
- crossref:10.1287/mnsc.41.10.1693
- crossref:10.1504/ijmpt.2010.035802
cite & interoperate
Renbin Xiao, Tinggui Chen. (2011). Notice of Retraction Enhancing ABC Optimization with Ai-Net Algorithm for solving project scheduling problem. https://doi.org/10.1109/icnc.2011.6022504
@article{crossref101109icnc201160,
title = {Notice of Retraction Enhancing ABC Optimization with Ai-Net Algorithm for solving project scheduling problem},
author = {Renbin Xiao and Tinggui Chen},
year = {2011},
doi = {10.1109/icnc.2011.6022504}
}
JSON · citations JSON · CITO argument graph · IIIF v3 manifest · embed card