Retracted: Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine
Retracted (retraction, 2023-12-13): Retracted: Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine
2023 · doi:10.1155/2023/9851978
references (1)
- crossref:10.1155/2022/2886565
cite & interoperate
(2023). Retracted: Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine. https://doi.org/10.1155/2023/9851978
@article{crossref1011552023985197,
title = {Retracted: Optimisation of Working Line Length during the Period of Gently Inclined Slope in Tilted Coal Seam Open-Pit Mine},
year = {2023},
doi = {10.1155/2023/9851978}
}
JSON · citations JSON · CITO argument graph · IIIF v3 manifest · embed card