Interactive Lab 2: Stop the Avalanche: Attested Event-Driven Orchestration vs. Unattested Chat

2026

Zero-clock eventfd cuts 1%-duty socket energy by 2.21x (300.73 J -> 136.32 J), while 25.95 us BLAKE3+Ed25519 verification + SSP min-cost flow contains 200/200 Byzantine faults at 14.97x higher CpJ.
linked multimodal & document assets
cite & interoperate

(2026). Interactive Lab 2: Stop the Avalanche: Attested Event-Driven Orchestration vs. Unattested Chat.

@article{openietutoriallab02attes,
  title = {Interactive Lab 2: Stop the Avalanche: Attested Event-Driven Orchestration vs. Unattested Chat},
  year = {2026}
}

JSON · citations JSON · CITO argument graph · IIIF v3 manifest · embed card