1 After construction, drills are used to disrupt the soil, which is then removed by autonomous vehicles, leaving a ready-made tunnel with reusable pipes for maintenance.
“once the structure is complete drills are brought back in to disrupt the soil which is then removed by autonomous vehicles leaving behind a ready-made tunnel then other than a bit of final preparation to the walls and of course the laying of the road or rail line the tunnel is ready to go and those ball pipes can even be reused for maintenance”